|
Type of Construction |
RCC framed structure (Earthquake resistant). |
|
Exterior Finish |
Permanent finish including stone cladding, composite aluminum
sheets, Reflective glass curtain wall & texture paint finishes. |
|
Internal Finish |
POP/ gypsum board false ceiling/aluminum ceiling in public area.
Stone/vitrified tile/stainless steel/ textured paint. Covering
on the walls in Common spaces Plastered & DD painted walls in
shops. |
|
Doors & Windows |
Aluminum glass glazing for show windows & doors. |
|
Flooring |
Polished granite/vitrified tiles in common areas &
marble/ceramic file flooring in shops. |
|
Toilets |
Provision for hot & cold water pipes in all toilets, vitrified/
ceramic tile flooring/ walls, sanitary/ chinware in light
coloured shades of standard make. High quality CP fitting be
provided. |
|
Ventilation |
Through centrifugal fans wherever required. |
|
Plumbing |
Storage tanks for water, soil, waste & vent pipes. |
|
|
Grease traps for kitchen |
|
Lighting |
Facade lighting, street lighting, Advt. & glow signage, required
internal and task lighting. |
|
Security System |
CCTV & other hi-tech controls round the clock security. |
|
Air Conditioning |
Centrally air-conditioned complex with Integrated lighting, Fire
alarm system and International quality FCUs. AHUs, Energy
efficient chillers. |
|
Electrical System |
Uninterrupted Power supply with 100% Power Backup DG sets of
international standards electrical wiring and outlets separate
metering for each shop. |
|
Fire Fighting and Detection system |
Shutdown of HVAC system in case of fire, Automatic smoke
extraction in case of fire, Fire alarm system, Hose Reel
provided, Wet riser provided, Yard hydrant provided, Fire
extinguishers provided, Automatic sprinkler system, Break glass |
|
Common Facilities |
Common toilets in each floor, Modern high class glass fronted
lifts, Piped music in all public areas, Public address system,
Parking in basement connected through lifts, Escalators,
Elevators, Atriums. |
|
|